|
Before this work commences trees will be chopped down and house will be demolished. This work includes pulling out 5 tree roots and concrete/bricks on photos. Concrete/bricks is around house including the steps, bathroom floor, laundry floor and under the house
There are roof tiles which have to be pushed few meters for temporary road. If there are extra tiles for the road it has to be transported with concrete and tree roots
All concrete tree roots have to be transported from Fairfield to Kemps Creek. When it is finished all have to be to same level (no holes in the ground). To see more photos about work download zip file. |